The short answer
To start a tiling business, get an ABN, public liability insurance and the licence your state needs: in NSW, wall and floor tiling over $5,000 needs a licence, which covers waterproofing a wet area ready for tiling; in Queensland, the QBCC wall and floor tiling licence includes waterproofing for tiling; and in Victoria, tiling on its own doesn’t need registration. Register for GST once you expect $75,000 a year in turnover, and price from your real costs per square metre. The common traps are underquoting prep and waterproofing, unclear tile supply, no deposits, slow quotes and lifting old floors without checking for asbestos. Steady work comes from a Google Business Profile with real bathroom photos, your first 20 reviews, booking the measure on the first call and following up every quote, regrouts and reseals for past customers, and builders, bathroom renovators and plumbers who need a reliable tiler.
1. Where to start: the checklist for a new tiling business
- ABN (Australian Business Number): free through business.gov.au. If you don’t quote one, a business customer may have to withhold 47% of what they pay you.
- Licence: in NSW, a wall and floor tiling licence is needed for residential work over $5,000, and it covers waterproofing a wet area ready for tiling. Waterproofing on its own has a separate licence. In Queensland, the QBCC (Queensland Building and Construction Commission) wall and floor tiling licence includes waterproofing for tiling. In Victoria, wall and floor tiling on its own doesn’t need registration, but other domestic building work over $10,000 does. In other states, check with your state regulator.
- Waterproofing: wet areas are done to AS 3740 (the Australian Standard for waterproofing wet areas), and you provide the waterproofing certificate.
- Asbestos: in NSW, asbestos vinyl was made before 1987, so older floors need a licensed assessor and removalist if asbestos is suspected. Check before old vinyl or floor tiles come up.
- GST (the 10% goods and services tax): you must register once your GST turnover is $75,000 a year or more, or you expect it to be. You can register earlier. Check with the ATO (Australian Taxation Office) or your accountant.
- Insurance: public liability, usually $5 million, $10 million or $20 million of cover. Builders often set the minimum. As a sole trader, workers comp won’t cover your own injuries, so look at income protection or accident and sickness cover. For bigger jobs contracted directly with a homeowner, check whether your state needs home warranty cover.
- Van and gear: buy, finance or lease changes your cash flow and your tax claims. Check the deal with your accountant before you sign.
- First prices: work out your hourly rate from your real costs (see below), then build per-square-metre prices for floors, walls and wet areas, with prep and waterproofing priced separately.
- A separate business bank account, and money put aside for tax from every payment.
| Step | Example |
|---|---|
| What you want to pay yourself in a year, including super | $90,000 |
| Yearly business costs: van, fuel, cutters, mixers, dust extraction, insurance, phone, accountant | $30,000 |
| Hours you can actually charge: 46 weeks × 30 hours | 1,380 hours |
| Break-even rate: $120,000 ÷ 1,380 hours | About $87 an hour |
| Then add profit, and GST if you’re registered | Your call, +10% |
2. Common pitfalls for new tilers, and the fix for each
| Pitfall | Why it hurts | The fix |
|---|---|---|
| Underquoting prep | Stripping old tiles, screeding and levelling take longer than the laying | Price demolition, screed and waterproofing as their own lines on the quote |
| Unclear tile supply | Arguments over who buys the tiles, how many spares and who pays for breakages | Say on the quote who supplies the tiles, by supplier, range and size, and how much extra is allowed |
| Floors out of level | Fixing a bad substrate for free wipes out the profit | List “fixing floors that are out of level” as not included, with how it’s priced if needed |
| No deposit | You pay for adhesive, membrane and sometimes tiles before the customer pays you | Take a deposit before you order materials, inside your state’s limit for home building work |
| Slow quotes | The job often goes to whoever books the measure and quotes first | Book the measure on the first call and quote within 24 hours of it |
| Chasing payment | A bathroom invoice left unpaid can wipe out a fortnight’s profit | Bill in stages on bigger jobs and invoice the day you finish |
| No reviews | A new profile with no reviews looks risky next to one with twenty | Ask every customer once the grout has cured, then text your review link the same day |
| Taking every job | Tiny jobs across town between bathrooms waste whole days | Set a minimum charge and your service area, and say no politely to the rest |
| Lifting old floors blind | Older vinyl or floor tiles may contain asbestos | Check before they come up, and use a licensed assessor and removalist if asbestos is suspected |
3. How to get tiling jobs consistently
Most tiling work is planned and quote-driven. The urgent calls are leaking showers, and those callers want someone out to look before the damage spreads.
- Set up a free Google Business Profile, list the suburbs you cover and post before and after photos of real bathrooms, splashbacks and floors.
- Get your first 20 reviews: ask in person once the grout has cured, text your Google review link the same day and send one friendly reminder a few days later. Never pay or offer a discount for a review.
- Book the measure on the first call, quote within 24 hours and follow up every quote: the day you send it, 2 to 3 days later, about a week later and before it expires.
- Answer every leak call and get out to look. A leaking shower can turn into a regrout, a reseal or a full retile.
- Repeat and seasonal work: renovations bunch up before Christmas (CommBank data shows construction work lifting about 19% from October to December, 2024 data, all construction). In quieter months, ring past customers about regrouts and reseals.
- Referral partners: builders, bathroom renovators and plumbers need a reliable tiler. Waterproofers, cabinet makers and real estate agents preparing homes for sale pass on work too.
- After each job, ask about the laundry, a splashback or another room.
- Local community groups: post finished bathrooms in suburb Facebook groups with the owner’s OK, and answer questions about grout and leaks.
In plain terms: a basic bathroom renovation at the low end of the range hipages gives via Canstar is about $8,000, so every bathroom enquiry is worth answering fast and following up.
4. Your first quote and invoice
Use one quote layout for every job. A tiling quote should show your ABN and licence number where your state needs one, each area in square metres, the tiles and who supplies them, the prep, screed and waterproofing, grout and silicone, what’s not included (such as plumbing, electrical and asbestos work), the total with GST, the deposit and an expiry date.
Talking the measure-up through into your phone on site and turning it into a quote later saves an evening at the kitchen table. Our AI starter kit shows a free way to do that.
5. Need a hand?
If the phone and the paperwork are getting away from you, LeadAI’s AI staff can answer calls and follow up quotes while you’re on the tools. Ring Emily on 0468 199 598 to hear how it works, or book a chat.
Questions people ask
- Do I need a licence to start a tiling business?
- It depends on your state. In NSW, wall and floor tiling over $5,000 needs a licence. In Queensland, the QBCC wall and floor tiling licence covers tiling and waterproofing for tiling. In Victoria, tiling on its own doesn’t need registration. Check with your state regulator.
- Can I do the waterproofing myself?
- In NSW, the wall and floor tiling licence covers waterproofing a wet area ready for tiling, and in Queensland the QBCC tiling licence includes waterproofing for tiling. Do it to AS 3740 and give the customer the waterproofing certificate. In other states, check with your state regulator.
- Do I need to register for GST straight away?
- No. You must register once your GST turnover is $75,000 a year or more, or you expect it to be. You can choose to register earlier. Check with the ATO or your accountant.
- How much should I charge as a new tiler?
- Work out your break-even hourly rate from what you want to pay yourself and your yearly costs, divided by the hours you can bill. Then set per-square-metre prices for floors, walls and wet areas, with prep and waterproofing priced separately. Airtasker puts installed floor tiling at a median of $72 a square metre (2025), but price from your own costs.
- Should I take a deposit?
- Yes, on anything where you buy materials up front, such as a bathroom. Keep it inside your state’s limit for home building work, such as 10% in NSW, and bill bigger jobs in stages.
- How do I get my first tiling customers?
- Set up a free Google Business Profile with real bathroom and floor photos, let local builders, bathroom renovators and plumbers know you’re available, and answer every enquiry fast. Ask every customer for a review once the grout has cured.
Sources
- 1. business.gov.au, Register for an Australian Business Number
- 2. ATO, Registering for GST
- 3. ATO, Withholding if ABN not provided
- 4. NSW Government, Wall and floor tiling work (June 2026)
- 5. NSW Government, Waterproofing work (June 2026)
- 6. QBCC, Wall and floor tiling licence
- 7. Consumer Affairs Victoria, Becoming a registered building practitioner (July 2025)
- 8. NSW Government, Vinyl floor tiles and coverings and asbestos
- 9. business.gov.au, Types of business insurance
- 10. NSW Government, Building contracts and deposits
- 11. QBCC, Understanding deposits and progress payments
- 12. Airtasker, Tile flooring cost (March 2025)
- 13. Canstar, Bathroom renovation cost (July 2026)
- 14. CommBank, Small business festive cashflow (October 2025)
- 15. Google Business Profile Help, Tips to get more reviews
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Your first year running a trade business in Australia: the business side
The business side of your first year: registrations, pricing, quotes, reviews, getting found, getting paid and when to hire. Also as a free PDF.
- Tiling quote template and invoice template (free, Australia 2026)
A bathroom tiling quote and a tax invoice to copy, typical tiling and flooring line items and exclusions, a cover email, licence and contract rules by state, and a prompt to turn measure notes into a quote.
- Trade licences in Australia: who issues them in each state and what you need to work for yourself (2026)
The regulator for building, electrical and plumbing work in every state and territory, when you need a contractor licence, display rules, working interstate and how to check a licence.
- Insurance for tradies in Australia (2026): what you need and what it costs
Public liability, workers comp by state, cover for yourself, tools, the ute, home warranty thresholds, licence rules, published prices and what to ask a broker.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- Cash flow for tradies: deposits, progress payments and never being caught short on tax (Australia, 2026)
Deposits inside your state’s limits, progress payments, payment terms to copy, card payments after the surcharge ban, a weekly tax set-aside, BAS, a 13-week forecast and what to do if you fall behind with the ATO.
- Variation form template for tradies: free download (Word and PDF), plus what to record
A free one-page variation form in Word and PDF, what every variation should record, the NSW, Queensland and Victorian rules on written variations, and a text to send with it.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.