The short answer
A tiling quote should show your business name, ABN (Australian Business Number) and licence number where your state needs one, the customer and job address, each area in square metres, the tiles by supplier, range and size (and who supplies them), the prep, screed and waterproofing, grout and silicone, what’s not included (such as plumbing, electrical, asbestos testing or removal, and fixing floors that are out of level), the total price including GST (the 10% goods and services tax), the deposit, how changes are priced and an expiry date. In NSW, wall and floor tiling over $5,000 needs a licence, which covers waterproofing a wet area ready for tiling. The invoice must say “Tax invoice” if you’re registered for GST and show your business name, ABN, the date, the work with quantity and price, and the GST; for $1,000 or more, add the customer’s name or ABN.
What a tiling quote should include
| Item | For a tiler, that means |
|---|---|
| Business name, ABN, contact details | So the customer knows who it’s from. Your ABN goes on the invoice too. |
| Licence number | NSW: a wall and floor tiling licence for residential work over $5,000, which covers waterproofing a wet area ready for tiling (waterproofing also has its own licence). Queensland: the QBCC (Queensland Building and Construction Commission) wall and floor tiling licence includes waterproofing for tiling, and timber and engineered floors need a floor finishing and covering licence over $3,300. Victoria: tiling on its own doesn’t need registration, but other domestic building work over $10,000 does. |
| Job address and access | Which floor, stairs or lift, where tiles can be stored, and whether the room can be out of use. |
| Each area in square metres | Floor, walls, shower recess, splashback, listed separately. |
| Tiles and who supplies them | Supplier, range, size and finish, and an allowance for cuts and breakage. If the customer supplies tiles, say so. |
| Prep, screed and waterproofing | Demolition, removal of old tiles, screed or levelling, and waterproofing to AS 3740 (the Australian Standard for waterproofing wet areas), with the certificate. |
| Old floors and asbestos | In NSW, asbestos vinyl was made before 1987. If old vinyl or floor tiles are coming up, say how a suspected asbestos find is handled. |
| What’s not included | Plumbing, electrical, asbestos testing or removal, and fixing floors or walls that are out of level or out of square. |
| Price, deposit and payment terms | The total including GST, the deposit inside your state’s limit, and when the rest is due. |
| Changes and expiry | Extra work quoted in writing before you do it, and a date the quote runs out, such as 30 days. |
Tiling quote template to copy
Copy this into your quoting app, a Word document or an email, and change the areas, tiles and amounts to suit the job. The bathroom retile is only there to show the layout. Put in your own work and your own prices.
QUOTE [Business name] · ABN [00 000 000 000] · Licence [number and class] [Phone] · [Email] Quote number: Q-[0000] Date: [date] Valid until: [date, e.g. 30 days] For: [Customer name] Job address: [Street, suburb, state, postcode] Home built about: [year] THE JOB Strip and retile the main bathroom, including the shower recess. 1. DEMOLITION Remove existing floor and wall tiles in [areas], take away rubbish $____ 2. PREP AND WATERPROOFING Screed floor to falls, waterproof the shower and floor to AS 3740, waterproofing certificate supplied $____ 3. FLOOR TILING [area] m², [supplier, range, size, finish] $____ 4. WALL TILING [area] m² to [height / full height], [supplier, range, size] $____ 5. FINISHING Grout [colour], silicone to corners and fixtures, trims in [material] $____ TILES Supplied by: [us / you]. Quantity allows [__%] for cuts and breakage. INCLUDED • Labour, adhesive, grout, silicone and trims • Waterproofing membrane and certificate • Rubbish removal NOT INCLUDED • Plumbing and electrical work (disconnect and reconnect) • Asbestos testing or removal. If we suspect asbestos, we stop and you’ll need a licensed assessor • Fixing walls or floors that are out of level or out of square beyond normal screeding (quoted in writing if needed) • Damage found behind tiles once removed (quoted in writing before we go on) PRICE Labour: $____ Materials: $____ TOTAL: $____ including GST PAYMENT Deposit: $____ to book the start date Balance: due [7 or 14] days from the invoice Bank transfer: BSB [000-000], account [00000000], reference Q-[0000] CHANGES Any change to the job is quoted in writing and agreed before we do it. This is a fixed-price quote. To go ahead, reply to this email, sign below or pay the deposit. Accepted by: ____________________ Date: __________
Typical line items and exclusions for tiling and flooring jobs
| Line item or exclusion | Job type | What to write |
|---|---|---|
| Demolition and removal of old tiles | Bathrooms, floors | Which areas, and rubbish removal. |
| Screed or levelling | Floors, showers | Where, and whether falls to the waste are included. |
| Waterproofing | Wet areas | Areas covered, the standard (AS 3740) and the certificate. |
| Floor tiles | Tiling | Area in m², supplier, range, size, and who supplies them. |
| Wall tiles | Tiling | Area in m², height, supplier, range and size. |
| Grout, silicone and trims | Tiling | Grout colour and type, trim material. |
| Regrout or reseal | Repairs | Area in m², and whether old grout is raked out. |
| Hybrid, laminate, vinyl or timber floors | Flooring | Area, product by brand and range, underlay, and trims. |
| Floor sanding and polishing | Flooring | Area, number of coats and product. |
| Asbestos testing or removal | Exclusion | Excluded. Older vinyl may need a licensed assessor and removalist. |
| Plumbing and electrical | Exclusion | Excluded, unless you’re licensed and have priced it. |
Cover email to send with the quote
Subject: Your tiling quote for [address] from [business name]
Hi [name], Thanks for having me out to measure up. Your quote for [the bathroom retile] is attached. It lists every area in square metres, the tiles, and the waterproofing with its certificate. It’s a fixed price of $____ including GST, good until [date]. If you’d like to change the tiles or the wall height, just reply and I’ll update it. To lock in a start date, reply yes and I’ll send the deposit details and a few notes on getting the room ready. If you’d rather we didn’t follow up, just reply “no thanks”. Thanks, [Your name] [Business name] · ABN [number] · Licence [number]
What a tiling tax invoice must show
If you’re registered for GST, your invoice must be a tax invoice. The ATO (Australian Taxation Office) says it must show:
- That it’s intended to be a tax invoice: put “Tax invoice” at the top.
- Your business name and your ABN.
- The date it was issued.
- A brief description of the work and materials, with quantity (if it applies) and price.
- The GST payable, or “Total price includes GST” if the GST is exactly one-eleventh of the total.
- The extent to which each item is taxable.
- For sales of $1,000 or more: the customer’s name or ABN.
If a customer asks for a tax invoice, you must give one within 28 days, unless the sale is $82.50 or less including GST. If you’re not registered for GST, call it an invoice, not a tax invoice, and don’t charge GST. Worth adding: an invoice number, the job address, your quote number and your licence number.
Tiling invoice template to copy
This version takes off the deposit already paid. On a bigger job, such as a bathroom and laundry, you can bill a progress payment when waterproofing is done and the certificate is issued.
TAX INVOICE [Business name] · ABN [00 000 000 000] · Licence [number] [Phone] · [Email] Invoice number: INV-[0000] Date issued: [date] Due date: [date] Your quote number: Q-[0000] Bill to: [Customer name], [ABN if a business] Job address: [Street, suburb, state, postcode] WORK DONE Demolition and rubbish removal $____ Screed and waterproofing to AS 3740 $____ Floor tiling, [area] m², [range] $____ Wall tiling, [area] m², [range] $____ Grout, silicone and trims $____ Tiles supplied: [quantity] m², [range] $____ Variation V-[01]: [extra screed, agreed in writing, date] $____ Subtotal (excluding GST): $____ GST (10%): $____ TOTAL including GST: $____ Less deposit paid [date]: $____ Less progress payment paid [date]: $____ BALANCE DUE: $____ CERTIFICATES Waterproofing certificate [number]: attached HOW TO PAY Bank transfer: BSB [000-000], account [00000000], reference INV-[0000] Please pay by [due date].
Deposits, progress payments and written contracts for tilers
- Take the deposit inside your state’s limit, and put it on the quote.
- Tie each progress payment to a stage the customer can see, such as “waterproofing done and certificate issued”.
- A quote is a fixed price once accepted. Rotten sheeting or a floor that needs more levelling goes on a written variation before you go on.
| State | What applies |
|---|---|
| NSW | A wall and floor tiling licence for residential work over $5,000. Residential building work over $5,000 including GST needs a written contract, and the deposit is capped at 10%. |
| QLD | The QBCC wall and floor tiling licence; a floor finishing and covering licence for timber and engineered floors over $3,300. Domestic building work over $3,300 needs a written, signed contract before work starts. |
| VIC | Tiling on its own doesn’t need registration, but other domestic building work over $10,000 does, and most domestic building work over $10,000 needs a major domestic building contract. |
Let AI write it
Talk SAM through the job on the drive home, from the square metres to the tile, the screed and the waterproofing, and LeadAI’s SAM writes the quote and the invoice by voice. Emily follows up every quote you send, and Carol chases the deposit and the final invoice with the reminders you’ve approved. The scope and the price stay with you. From about $2.08 a day each on the Growth plan, plus GST.
A chat assistant like ChatGPT, Microsoft Copilot or Google Gemini can also turn your measure notes into a first draft. Check every area, tile and price before it goes out.
You’re helping an Australian tiler write a quote. Using my measure notes below, write a quote in this order: the job, each stage as a numbered section (demolition, prep and waterproofing, floor tiling, wall tiling, finishing) with square metres, tiles and who supplies them, what’s included, what’s not included (plumbing, electrical, asbestos, out-of-level floors), price (labour, materials, total including GST), deposit and payment terms, how changes are handled, and the expiry date. Leave every price as $____ for me to fill in. Use plain Australian English. Don’t add anything I haven’t mentioned or give waterproofing advice; list any questions instead. My notes: [paste your notes or voice-note transcript: rooms, sizes, tiles, what’s down now, age of the home]
Questions people ask
- Does a tiling quote need my licence number?
- Where the job needs a licence, show it. In NSW, wall and floor tiling over $5,000 needs a licence. In Queensland, tiling needs a QBCC licence, and timber and engineered floors over $3,300 need a floor finishing and covering licence. In Victoria, tiling on its own doesn’t need registration.
- Should I charge a deposit for a tiling job?
- Many tilers take a deposit to book the start date and cover tiles ordered. Keep it inside your state’s limit, such as 10% in NSW on jobs over $5,000, and check your state’s building or fair trading regulator for the limit where you work.
- Quote or estimate for tiling?
- Say which it is. A quote is a fixed price once accepted; an estimate can change. Give a fixed price for the areas you’ve measured, and list damage behind old tiles or extra levelling as exclusions to be quoted in writing if found.
- Should waterproofing be on the tiling quote?
- Yes, as its own line: the areas covered, the standard (AS 3740) and the certificate you’ll supply. In NSW and Queensland, the tiling licence covers waterproofing a wet area ready for tiling.
- What should a tiling quote exclude?
- Usually plumbing and electrical, asbestos testing or removal, fixing floors or walls that are out of level beyond normal screeding, and damage found behind old tiles. In NSW, asbestos vinyl was made before 1987, so ask when the house was built.
Sources
- 1. ATO, Tax invoices
- 2. business.gov.au, How to invoice
- 3. ACCC, Component pricing
- 4. WA Consumer Protection, Estimates and quotes
- 5. NSW Government, Wall and floor tiling work (June 2026)
- 6. NSW Government, Waterproofing work (June 2026)
- 7. NSW Government, Contracts for residential building work
- 8. QBCC, Wall and floor tiling licence
- 9. business.gov.au, Floor finishing and covering (hard sector) licence, Queensland
- 10. QBCC, Key information for licensees and home owners
- 11. Consumer Affairs Victoria, Becoming a registered building practitioner (July 2025)
- 12. Consumer Affairs Victoria, Preparing a major domestic building contract
- 13. NSW Government, Vinyl floor tiles and coverings and asbestos
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Quote template for tradies: what every tradesman’s quote needs, plus a free template to download
What every quote needs, a free quote template in Word and PDF, a cover email to copy, the GST and pricing rules, and when a quote has to become a written contract.
- Invoice template for tradies: free tax invoice template (Word and PDF), plus what the ATO requires
A free tax invoice template in Word and PDF, a plain invoice for tradies not registered for GST, what the ATO requires on every tax invoice, and wording to copy.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- How to chase unpaid invoices as a tradie in Australia
Reminder timings that work, the contact rules you have to stay inside, letters of demand, Security of Payment and small claims limits by state.
- Best AI tools and apps for tilers and flooring installers (2026)
Which AI tools a tiler or floor layer can use to measure rooms, work out tile, adhesive and grout quantities, plan the set-out, show customers the finish, write quotes and keep photo records.