The short answer
Charge by the hour when you can’t see the whole job, a fixed price when you can, and a day rate or per-item price for work you repeat. Know the difference between markup and margin: a 30% markup on your costs is only a 23% margin on the price, so tradies who mix them up earn less than they think. Price materials from what they cost you after trade discounts, add a markup and charge for the time to collect them. Tell customers about call-out fees, minimum charges and after-hours rates before you go, put every variation in writing, and review your prices at least once a year.
1. Hourly, fixed price, day rate or per item: which suits the job
There’s no single right way to charge. Most trade businesses use two or three of these, depending on the job. The question is who carries the risk if the job takes longer than you thought.
| Pricing model | Suits | Who carries the risk | Watch out for |
|---|---|---|---|
| Hourly rate (charge-out rate) | Fault-finding, repairs and jobs where you can’t see the problem until you open it up: a leak in a wall, an intermittent electrical fault | The customer pays if it takes longer | Customers worry about an open-ended bill. Give a likely range and ring before you go past it |
| Fixed price (a quote) | Jobs you can see and measure: a bathroom fit-off, a fence, a paint job, a new switchboard | You do. If it takes longer, you wear it | Quote the scope tightly and list what’s not included, so anything extra becomes a priced variation |
| Day rate | Labour-only work for builders, landscaping or painting where the days are predictable, and subcontract work | Shared: the customer pays per day, you control the pace | Say what a day is (hours on site) and whether materials, travel and tipping fees are extra |
| Per item or per unit | Repeat work you’ve done hundreds of times: per power point, per downlight, per square metre of tiling or turf, per window for cleaners | You, but you know the numbers well | Set a minimum charge so a one-item job still pays for the trip |
In plain terms: on a fixed price you get paid for being fast and good at estimating. On an hourly rate you get paid for the time, but you have to keep the customer comfortable with the bill.
2. Markup vs margin: the money mistake that costs the most
Markup is what you add on top of your cost, as a share of the cost. Margin is the profit you keep, as a share of the selling price. They use the same dollars but a different base, so the percentages are never the same.
If you decide you want a 30% margin and then add 30% to your costs, you’ve priced for a 23% margin. That gap is pure profit you meant to earn and didn’t.
The formulas: margin = markup ÷ (1 + markup). To hit a target margin, price = cost ÷ (1 − margin). Work all of this on prices without GST (the 10% goods and services tax). GST isn’t yours, so it’s never part of your margin.
- Quick conversions: 20% markup = 16.7% margin. 25% markup = 20% margin. 30% markup = 23.1% margin. 50% markup = 33.3% margin. 100% markup = 50% margin.
- Going the other way: a 20% margin needs a 25% markup, a 30% margin needs a 42.9% markup and a 40% margin needs a 66.7% markup.
- Discounts bite harder than they look. Take 10% off the example $1,300 price and you charge $1,170. Your cost is still $1,000, so profit drops from $300 to $170: 43% less profit for a 10% discount.
- Your accountant and your software may report margin, so ask which one they mean when they quote you a percentage.
| Example job, prices without GST | 30% markup | 30% margin |
|---|---|---|
| Your cost: materials, labour at cost and a share of overheads | $1,000 | $1,000 |
| How the price is worked out | $1,000 × 1.30 | $1,000 ÷ 0.70 |
| Price to the customer, without GST | $1,300 | $1,428.57 |
| Profit on the job | $300 | $428.57 |
| Actual margin (profit ÷ price) | 23.1% | 30% |
| Customer pays, with 10% GST added | $1,430 | $1,571.43 |
| Profit over a year with $200,000 of job costs | $60,000 | $85,714 |
In plain terms: decide the margin you want to keep, then use price = cost ÷ (1 − margin). Don’t add the margin percentage to your costs.
3. Pricing materials: trade discounts, markup and pick-up time
Materials are often where the profit quietly leaks out: priced at cost, bought at the wrong price, or collected on unpaid time.
- If you’re registered for GST, you can generally claim back the GST on what you buy for the business, so work out your materials cost without GST, then add GST to your selling price. Check your own case with your accountant.
- The trade discount is yours to keep or share. You can quote at the supplier’s list price or at your cost plus a markup. Either way, never call it “at cost” if it isn’t.
- Markup on materials pays for your time choosing them, the risk of the wrong part, warranty call-backs and the money tied up until the customer pays.
- Allow for offcuts, breakage and the extra box, based on what your own past jobs used.
- Price at today’s replacement cost, not what the stock on the shelf cost you last year.
- For big or volatile items, say how long your materials prices are held, and that they’re confirmed when the customer accepts.
- Count the trips. Two supplier runs on a job can wipe out the markup on everything you bought.
| Step | Example |
|---|---|
| Supplier’s list price, without GST | $400 |
| Your trade discount, example 20% | − $80 |
| What it costs you, without GST | $320 |
| Add your materials markup, example 25% | + $80 |
| Materials price on the quote, without GST | $400 |
| Time to order, collect and return the wrong one: example 45 minutes at an example $100 an hour charge-out rate | + $75, either as its own line or built into the job price |
4. Call-out fees, minimum charges and after-hours rates
A call-out fee or minimum charge covers the part of every job that no one pays for by the hour: driving there, parking, finding the problem and setting up. After-hours and emergency rates cover the evenings and weekends you give up, and any penalty rates you pay staff.
- Tell the customer every fee on the phone, before you drive out, then confirm it in a text. No one argues with a fee they agreed to.
- A minimum charge, for example one hour, stops a 10-minute job from losing money once you count the travel.
- Some tradies take the call-out fee off the job price if the customer goes ahead. Say so up front if you do.
- If you advertise a price, include every fee the customer can’t avoid. The ACCC (Australian Competition and Consumer Commission, the consumer law regulator) says businesses must show a total price that includes taxes and all unavoidable fees, and must tell consumers up front about fees that will apply.
- Card surcharges: since 1 October 2026, businesses can no longer add a surcharge for Visa, Mastercard, American Express or eftpos card payments, the ACCC says. Build your card fees into your prices instead.
- Emergency means emergency. Charge the higher rate when the customer chooses an urgent or after-hours visit, and give them the option of the next standard-hours slot.
| When | Example call-out fee | Example labour rate |
|---|---|---|
| Standard hours, example Monday to Friday 7am to 5pm | $90, includes the first 30 minutes on site | Your normal rate, in 15-minute blocks after that |
| Weekday evenings and Saturdays | $150 | 1.5 times your normal rate |
| Sundays, public holidays and overnight emergencies | $250 | 2 times your normal rate |
5. Pricing variations and extras: get them in writing
A variation is any change to the agreed job: extra work, different materials or something you found once you opened the wall. Unwritten variations are where fixed-price jobs lose their margin and where disputes start.
For home building work, most states set rules on variations. The details differ, so check your state’s building regulator or fair trading office. Three examples:
- Put a line in every quote saying how variations are priced: your hourly rate, your materials markup, or a fresh quote for anything big.
- Stop and price it before you do it. “While you’re here” jobs are still jobs.
- Send the variation as a text or email the customer can reply “yes” to, or sign in your job app, before you start the extra work.
- Keep a photo of what you found, especially for hidden problems like rot, old wiring or a cracked pipe.
| State | What the regulator says |
|---|---|
| NSW | Variations must be in writing, attached to the contract and signed by both the owner and the builder or tradesperson. Urgent work involving danger or property damage can be written up after. |
| Queensland | The contractor must give the variation in writing, and the owner must agree in writing. It must describe the change, the date of the request, any delay and the change in price or how it’s worked out. You can’t require payment for a variation before the variation work starts. |
| Victoria | You and your client must agree changes in writing and put the new price and completion date in the contract before the work is done, usually with a variation notice. Your client shouldn’t pay for variations to fix things you should have spotted before starting. |
Subject: Variation to your [job] at [address]: please approve
Hi [name], While doing [the job] we found [what you found, e.g. the subfloor joist under the shower is rotten]. Photo attached. Variation: [what extra work or change is needed] Extra cost: $[amount] including GST Change to timing: [e.g. adds half a day / no change] Payment: added to the final invoice Please reply YES to approve, or ring me on [number] if you'd like to talk it through. We won't start the extra work until you've approved it in writing. Thanks, [your name], [business name], licence [number]
6. When and how to put your prices up
business.gov.au suggests reviewing your prices at least once a year, or whenever your costs or market conditions change. For most tradies, that means a regular review plus a check whenever insurance, fuel, wages or a big supplier price goes up.
- Good times to review: the start of the financial year, when award wages or super change, when your insurance renews, and when a supplier sends a price rise.
- Honour every quote you’ve already sent until it expires. New prices apply to new quotes.
- Give regular customers notice, for example 30 days, so property managers and builders can update their own budgets.
- Raise a little and often rather than a big jump every few years. Small rises lose fewer customers.
- If you have ongoing agreements, such as a cleaning, lawn or maintenance contract, check what it says about price changes. Under unfair contract terms law, a standard-form term that lets one side change the upfront price without giving the other side the option to cancel may be unfair.
- Some customers will leave. If they were your cheapest, slowest-paying ones, that can free up time for better-paying work.
Subject: Our prices from [date]
Hi [name], Thanks for your work with [business name] over the past [year / few years]. From [date], our rates will change: - Standard hourly rate: $[new rate] including GST (was $[old rate]) - Call-out fee: $[new fee] including GST (was $[old fee]) Any quote we've already sent you stays at the quoted price until it expires, and work booked before [date] is charged at the current rates. The change covers rises in [e.g. insurance, fuel and materials]. We'll keep doing the same quality of work and answering when you call. If you have an ongoing agreement with us and would rather not continue at the new rates, just let me know before [date]. Thanks, [your name], [business name], [phone]
7. Price lists for common jobs
A price list for the jobs you do every week makes quoting faster and keeps your prices consistent between you, your staff and the office. Build each price from your costs and your target margin, not from what you charged last time.
- Show the price including GST if you sell to homeowners. The ACCC says businesses must show a total price including taxes and unavoidable fees. If a price list is shown only to other businesses, the GST doesn’t have to be included in the total.
- If a price on your website or list is wrong, fix it fast. If you show more than one price for the same thing, the ACCC says you must charge the lowest one or stop selling until it’s corrected.
- Say what’s included and what changes the price: access, height, the age of the property or extra items.
- Use “from” prices carefully. The price has to be one a real customer can actually get.
- Load the list into your job app (Tradify, ServiceM8, Xero and others let you save price items) so every quote uses the same numbers.
- Review the list whenever your costs change, at the same time as your rates.
| Job | What’s included | Price, including GST |
|---|---|---|
| Replace a standard power point | Supply and fit one standard double power point and test it, in standard hours | $[your price] |
| Replace a kitchen mixer tap | Fit a customer-supplied or standard mixer, new flexi hoses, test for leaks | $[your price] |
| Gutter clean, single storey | Up to [your limit] metres of gutter, downpipes checked, waste taken away | $[your price] |
8. Check a quote’s margin with a spreadsheet or AI
Before a big quote goes out, check the margin. A five-minute check catches the forgotten labour line, the materials at cost and the markup that was meant to be a margin.
| Column | What goes in it | Formula (example for row 2) |
|---|---|---|
| A: Line | Each material, labour line, call-out or sub-contractor | Type it in |
| B: Cost without GST | What it costs you | Type it in |
| C: Price without GST | What you’re charging | Type it in |
| D: Profit | Price minus cost | =C2-B2 |
| E: Margin | Profit as a share of price | =D2/C2 |
| F: Markup | Profit as a share of cost | =D2/B2 |
| G: Price for your target margin | What the line should be, with your target margin in cell J1 | =B2/(1-$J$1) |
| H: Price including GST | What the customer sees, if you’re registered for GST | =C2*1.1 |
Check the margin on this quote for my [trade] business. All figures are without GST. My costs: - Materials: [list each item and what it costs me] - Labour: [hours] at a cost of $[cost per hour] (what it costs me, not my charge-out rate) - Other: [call-out, tipping fees, sub-contractors, equipment hire] My quoted price: $[price] without GST. My target margin: [e.g. 30]%. 1. Show total cost, profit, margin (profit ÷ price) and markup (profit ÷ cost), step by step. 2. Tell me if I've hit my target margin, and what price would hit it exactly (cost ÷ (1 − margin)). 3. List any costs a [trade] job like this often forgets, so I can check them. 4. Show the price including 10% GST. Don't change my numbers. Mark anything you're unsure of with [CHECK].
Leave out customer names and addresses when you paste a quote into an AI tool, and check the maths yourself before you send the price. AI tools can get sums wrong.
9. Signs you’re too cheap
- You win nearly every quote. Customers comparing three quotes rarely all pick the same tradie unless the price is low.
- You’re booked out for weeks but there’s not much left in the account after the bills and the BAS (business activity statement, the GST and tax return you lodge with the ATO, the Australian Taxation Office).
- One job going wrong wipes out the month’s profit.
- You can’t afford to replace a tool, a ute or a sick week without stress.
- Customers never question your price, and some say you’re “very reasonable”.
- You haven’t put your prices up in over a year, but your insurance, fuel and materials have gone up.
- You’re not paying yourself super, or you’re doing the quotes and invoices unpaid every night.
- You price materials at what they cost you and don’t charge for the time to collect them.
- Your first move when a customer hesitates is a discount, rather than a smaller option.
In plain terms: if three or four of these sound familiar, run your last five jobs through the margin check above. The numbers will tell you whether it’s your rate, your materials or the extras you’re not charging for.
10. Where AI staff fit
Pricing is your call. The office work around it is what eats the evenings: answering the enquiry, writing the quote, following it up and chasing the invoice.
LeadAI’s SAM writes quotes and invoices from a voice note using your prices, Emily follows up every quote, Anna answers calls and books jobs, and Carol chases unpaid invoices. From about $2.08 a day each on the Growth plan, plus GST.
Questions people ask
- What’s the difference between markup and margin?
- Markup is profit as a share of your cost. Margin is profit as a share of the selling price. A 30% markup on a $1,000 cost gives a $1,300 price and $300 profit, which is a 23.1% margin. To get a 30% margin, divide the cost by 0.70, giving $1,428.57. Those are example figures to show the maths.
- Should a tradie charge hourly or a fixed price?
- Charge hourly when you can’t see the whole job, such as fault-finding and leaks, and give the customer a likely range. Quote a fixed price when you can see and measure the work, with a clear scope and a written variation for anything extra. Per-item prices and day rates suit repeat work.
- How much should I mark up materials?
- There’s no set figure. Work it out from the margin you want, and make sure it covers your time choosing and collecting materials, the risk of the wrong part, warranty call-backs and the wait to be paid. Price from your cost after trade discounts, without GST if you’re registered, and charge for pick-up time.
- Can I charge a call-out fee?
- Yes, many tradies do. Tell the customer the fee before you drive out and confirm it in writing. If you advertise a price, the ACCC says the total must include all unavoidable fees, so don’t add the call-out fee on later.
- Do I have to show prices including GST?
- If you sell to consumers, such as homeowners, the ACCC says you must show a total price that includes taxes such as GST and any unavoidable fees. If prices are shown only to other businesses, GST doesn’t have to be in the total. Check your own situation with the ACCC or your accountant.
- How often should a tradie put prices up?
- business.gov.au suggests reviewing prices at least once a year, or whenever your costs or market conditions change. Honour quotes you’ve already sent, give regular customers notice, and check what any ongoing agreements say about price changes.
Sources
- 1. business.gov.au, Develop a pricing strategy
- 2. business.gov.au, Display prices
- 3. ATO, How GST works
- 4. ATO, Registering for GST
- 5. ACCC, Price displays (total prices, GST, multiple prices and card surcharges)
- 6. NSW Government, Contracts for residential building work
- 7. QBCC, Contract changes and variations
- 8. Consumer Affairs Victoria, Changing a domestic building contract price
- 9. Queensland Government, Unfair contract terms
More guides
- Your first year running a trade business in Australia: the business side
The business side of your first year: registrations, pricing, quotes, reviews, getting found, getting paid and when to hire. Also as a free PDF.
- How to quote faster and win more jobs as a tradie
Win more of the jobs you quote: sort enquiries on the first call, quote from photos where you can, send within a day, give options, follow up and track your win rate.
- Quote template for tradies: what to include, plus a layout to copy
What every quote needs, a layout and cover email you can copy, the GST and pricing rules, and when a quote has to become a written contract.
- 50 AI prompts for tradies: copy, paste, done
50 prompts to copy into any AI chat app for quotes, customer messages, chasing payment, reviews, posts, hiring, admin and planning.
- Cash flow for tradies: deposits, progress payments and never being caught short on tax (Australia, 2026)
Deposits inside your state’s limits, progress payments, payment terms to copy, card payments after the surcharge ban, a weekly tax set-aside, BAS, a 13-week forecast and what to do if you fall behind with the ATO.