Solar quote template and invoice template (free, Australia 2026)

Solar and battery customers compare quotes line by line: panel and inverter brands, battery size, rebate and total. A quote that lists all of it clearly, and says what happens to the rebate if the install date moves, wins trust before you’ve set foot on the roof. Below is a quote to copy, typical line items and exclusions, a cover email, a tax invoice with a deposit line, and the rules to keep in mind. It’s general information, not legal or tax advice: check with your accountant, the Clean Energy Regulator or your state regulator for your situation.

By the LeadAI team, Melbourne · Updated

The short answer

A solar quote should show your business name, ABN (Australian Business Number), electrical licence number and Solar Accreditation Australia accreditation, the customer and site address, the panels, inverter and battery by brand, model and quantity, the system size, the price before and after the STC rebate (small-scale technology certificates), a note that the rebate is set by the installation date, what’s not included (such as switchboard upgrades, meter changes and roof repairs), the total including GST (the 10% goods and services tax), the deposit and an expiry date. The invoice must say “Tax invoice” if you’re registered for GST and show your business name, ABN, the date, each item with quantity and price, and the GST; for $1,000 or more, add the customer’s name or ABN.

What a solar quote should include

What to put on a solar and battery quote
ItemFor a solar installer, that means
Business name, ABN, contact detailsSo the customer knows who it’s from. Your ABN goes on the invoice too.
Licence and accreditationYour electrical licence number and your Solar Accreditation Australia (SAA) accreditation, which replaced the Clean Energy Council scheme in 2024.
Site detailsRoof type, pitch and storeys, shading, switchboard condition and the existing system, if any.
Equipment by brand, model and quantityPanels, inverter, battery, mounting and monitoring. This is what customers compare first.
System sizePanel array in kW, inverter size, and battery capacity in kWh.
STC rebateThe price before the rebate, the rebate amount, and the price after. Say it depends on the installation date.
Grid approval and certificatesThat you’ll lodge the grid application, and the electrical certificate the customer will get (in Victoria the Certificate of Electrical Safety, in NSW the CCEW, a Certificate of Compliance for Electrical Work).
What’s not includedSwitchboard upgrades, meter changes by the retailer or network, roof repairs, tree trimming and trenching, unless you’ve priced them.
Price, deposit and payment termsThe total including GST, the deposit, and the balance on completion.
ExpiryA date the quote runs out. With rebates stepping down every six months, tie it to the next step-down.

Solar quote template to copy

Copy this into your quoting app, a Word document or an email, and change the equipment and amounts to suit the job. The solar and battery system is only there to show the layout. Put in your own equipment and your own prices.

Solar and battery quote layout
QUOTE
[Business name] · ABN [00 000 000 000]
Electrical licence [number] · SAA accreditation [number]
[Phone] · [Email]

Quote number: Q-[0000]
Date: [date]
Valid until: [date]

For: [Customer name]
Site address: [Street, suburb, state, postcode]
Roof: [tile / metal], [single / double storey], [orientation]
Existing system: [none / size and inverter]

THE SYSTEM
Panels: [quantity] x [brand, model, watts]
        = [size] kW array                                  $____
Inverter: [brand, model, kW]                               $____
Battery: [brand, model, kWh]                               $____
Mounting, cabling, isolators and monitoring                $____

INSTALLATION
Installation by SAA-accredited installer                   $____
Grid connection application                                $____
Electrical certificate: [COES / CCEW / your state’s]       included

REBATE
Price before rebate: $____
Less STC rebate (small-scale technology certificates): –$____
The STC rebate is set by the installation date, not the date you
sign. If installation happens after [date of next step-down], the
rebate may be lower and the price will change.

NOT INCLUDED
• Switchboard upgrade (quoted in writing if needed)
• Meter changes by your retailer or network, and any fees
• Roof repairs, tree trimming or trenching
• Any work found once installation starts (quoted in writing
  before we do it)

PRICE
TOTAL after rebate: $____ including GST

PAYMENT
Deposit: $____ to book installation
Balance: due on completion
Bank transfer: BSB [000-000], account [00000000], reference Q-[0000]

To go ahead, reply to this email, sign below or pay the deposit.

Accepted by: ____________________   Date: __________

Typical line items and exclusions for solar jobs

Solar quote line items and what to say about them
Line item or exclusionWhat to write
PanelsQuantity, brand, model and watts, and the total array size in kW.
InverterBrand, model and size.
BatteryBrand, model and usable capacity in kWh.
Mounting and cablingRacking type for the roof, isolators and cabling.
MonitoringThe app or device, and who sets it up.
STC rebateShown as its own line, with a note that it depends on the installation date.
Grid applicationThat you lodge it, and that approval comes from the network.
Switchboard upgradePriced or excluded. Customers often don’t expect it.
Meter changesUsually done by the retailer or network. Say so.
Roof repairs, trees, trenchingExcluded unless priced.
ServicingEnergy Safe Victoria recommends a service every 2 years by a licensed electrician. Offer it on the quote.
The battery STC factor falls every six months, from 6.8 STCs per kWh (May to December 2026) to 2.1 by December 2030 (Clean Energy Regulator).

Cover email to send with the quote

Email to send with a solar quote

Subject: Your solar and battery quote for [address] from [business name]

Hi [name],

Thanks for your time at the site visit. Your quote for a [size] kW solar system with a [size] kWh battery is attached. It lists every panel, the inverter and the battery by brand and model. The total after the STC rebate is $____ including GST, and the quote is good until [date].

One thing to know: the rebate is set by the date we install, not the date you sign, and it steps down every six months. If you’d like to go ahead before [date of next step-down], reply yes and I’ll lock in an installation date.

If you have questions about the equipment or the rebate, just reply or ring me on [phone]. If you’d rather we didn’t follow up, just reply “no thanks”.

Thanks,
[Your name]
[Business name] · ABN [number] · Electrical licence [number]

What a solar tax invoice must show

If you’re registered for GST, your invoice must be a tax invoice. The ATO (Australian Taxation Office) says it must show:

  • That it’s intended to be a tax invoice: put “Tax invoice” at the top.
  • Your business name and your ABN.
  • The date it was issued.
  • A brief description of the equipment and work, with quantity (if it applies) and price.
  • The GST payable, or “Total price includes GST” if the GST is exactly one-eleventh of the total.
  • The extent to which each item is taxable.
  • For sales of $1,000 or more: the customer’s name or ABN.

If a customer asks for a tax invoice, you must give one within 28 days, unless the sale is $82.50 or less including GST. How you show the STC rebate on the invoice, and how GST applies to it, is a question for your accountant. Worth adding: an invoice number, the site address, your quote number and your licence number.

Solar invoice template to copy

This version takes off the deposit already paid. Check with your accountant how to show the STC rebate and GST for the way your business assigns certificates.

Solar tax invoice layout
TAX INVOICE
[Business name] · ABN [00 000 000 000]
Electrical licence [number] · SAA accreditation [number]
[Phone] · [Email]

Invoice number: INV-[0000]
Date issued: [date]
Installation date: [date]
Due date: [date]
Your quote number: Q-[0000]

Bill to: [Customer name], [ABN if a business]
Site address: [Street, suburb, state, postcode]

SUPPLIED AND INSTALLED
[quantity] x [panel brand, model, watts]                   $____
[inverter brand, model, kW]                                $____
[battery brand, model, kWh]                                $____
Mounting, cabling, isolators and monitoring                $____
Installation and grid connection application               $____
Variation V-[01]: [switchboard upgrade, agreed in writing]  $____

Less STC rebate: –$____

Subtotal (excluding GST): $____
GST (10%): $____
TOTAL including GST: $____
Less deposit paid [date]: $____
BALANCE DUE: $____

CERTIFICATES
Electrical certificate [number]: [attached / to follow]

HOW TO PAY
Bank transfer: BSB [000-000], account [00000000], reference INV-[0000]
Please pay by [due date].

Deposits, rebates and paperwork for solar installers

Most solar jobs are a deposit to book the install and the balance on completion. Put both on the quote, with the rebate timing, so the customer knows what changes if the date moves.

Whether home building contract rules apply to solar and battery work differs by state. NSW needs a written contract for residential building work over $5,000 including GST, Queensland for domestic building work over $3,300, and Victoria for most domestic building work over $10,000. Check with your state’s building or fair trading regulator, and the electrical safety regulator, whether your job is covered and what deposit you can take.

  • The battery rebate is set by the installation date, not the signing date, and the STC factor steps down every six months (Clean Energy Regulator).
  • In Victoria, solar and battery work is prescribed work: it needs an independent inspection within 8 business days, and the customer gets the Certificate of Electrical Safety within 4 days of the work being completed.
  • In NSW, the CCEW is lodged within 7 days through eCert.
  • A quote is a fixed price once accepted. A switchboard upgrade or other extra work goes in writing, agreed before you do it.

Let AI write it

Talk SAM through the system design on the way back from the site visit, and LeadAI’s SAM writes the quote and the invoice by voice. Emily follows up every quote you send, which matters when the rebate locks in at the install date, and Carol chases the deposit and final payment with the reminders you’ve approved. The system design, the price and the rebate figure stay with you. From about $2.08 a day each on the Growth plan, plus GST.

A chat assistant like ChatGPT, Microsoft Copilot or Google Gemini can also turn your site notes into a first draft. Check every model number, the rebate and the price before it goes out.

Prompt: turn solar site notes into a quote draft
You’re helping an Australian solar installer write a quote. Using my site notes below, write a quote in this order: site details, the system (panels, inverter, battery, mounting and monitoring, each with brand, model and quantity), installation and grid application, rebate (price before, STC rebate, price after, with a line saying the rebate is set by the installation date), what’s not included (switchboard, meter changes, roof repairs), total including GST, deposit and balance, and the expiry date. Leave every price and the rebate amount as $____ for me to fill in. Use plain Australian English. Don’t work out the rebate or add equipment I haven’t named; list any questions instead.

My notes: [paste your notes or voice-note transcript: roof, shading, switchboard, existing system, equipment, battery size]

Questions people ask

Does a solar quote need my licence and accreditation numbers?
Show both. Solar and battery installs are electrical work, and installers need Solar Accreditation Australia accreditation, which replaced the Clean Energy Council scheme in 2024. Customers compare quotes on exactly this.
How do I show the STC rebate on a solar quote?
Show the price before the rebate, the STC rebate as its own line, and the price after. Add a line saying the rebate is set by the installation date, not the signing date, so it may change if the install moves past the next step-down.
Should I charge a deposit for a solar install?
Most installers take a deposit to book the installation and the balance on completion. Whether a cap applies depends on your state and whether the job counts as home building work, so check with your state regulator.
What should a solar quote exclude?
Usually a switchboard upgrade (unless you’ve priced it), meter changes by the retailer or network, roof repairs, tree trimming and trenching. Say who handles each one.
How long should a solar quote be valid for?
No law sets it. Many installers tie it to the next rebate step-down, because the STC factor falls every six months and the rebate is set by the installation date.

Sources

  1. 1. ATO, Tax invoices
  2. 2. business.gov.au, How to invoice
  3. 3. ACCC, Component pricing
  4. 4. WA Consumer Protection, Estimates and quotes
  5. 5. Clean Energy Regulator, Battery rebates are changing from 1 May 2026 (March 2026)
  6. 6. Clean Energy Regulator, Solar Accreditation Australia announced as new accreditation scheme operator (2024)
  7. 7. Energy Safe Victoria, Solar safety
  8. 8. Energy Safe Victoria, Certificates of Electrical Safety for consumers
  9. 9. NSW Government, When to submit a Certificate of Compliance for Electrical Work (CCEW)
  10. 10. NSW Government, Contracts for residential building work
  11. 11. QBCC, Key information for licensees and home owners
  12. 12. Consumer Affairs Victoria, Preparing a major domestic building contract

Pick your trade

What AI staff do in your trade: the calls they take, typical job prices and the paperwork.

More guides

Ring Emily and hear it for yourself

Emily is one of our AI staff. Ring her any time, ask her anything, and see how your customers would be looked after. If it's a fit, book a quick screen share with the team.

Not ready to talk? Take the free 2-minute audit and see what your business is losing each month.

Emily answers LeadAI’s own line, any time. We look forward to speaking with you.