The short answer
A plastering quote should show your business name, ABN (Australian Business Number) and licence number, the job address, which rooms, walls or ceilings, the area in square metres, the board type and thickness by brand, the cornice profile, the finish you’ll leave it at, what’s not included (such as painting, electrical work on downlights, fixing the roof leak and asbestos testing in homes built before 1990), the total including GST, the deposit and an expiry date. In NSW, dry and wet plastering each need a contractor licence for residential work over $5,000; in Queensland a QBCC licence is needed over $3,300. If you’re registered for GST, the invoice must say “Tax invoice” and show your business name, ABN, the date, the work with quantities and prices, and the GST.
What a plastering quote should include
| Item | What to write for a plastering job |
|---|---|
| Business name, ABN, contact details | Your ABN goes on the invoice later too, so put it on the quote now. |
| Licence number | In NSW, dry plastering (plasterboard, fibrous plaster, cornices, suspended ceilings) and wet plastering each need a contractor licence for residential work over $5,000 in labour and materials. In Queensland, a QBCC (Queensland Building and Construction Commission) licence over $3,300, in the plastering drywall or plastering solid class. In Victoria, plastering alone doesn’t need registration, but plastering combined with another skill, such as painting, does over $10,000. |
| Job address and access | Ceiling height, stairs, and where the old sheets go. |
| The rooms and areas | Which rooms, walls or ceilings, and the area in m². |
| Materials by name | Board brand, type and thickness (standard, wet area, fire-rated), cornice profile. |
| The finish | Set and sanded ready for paint, or what else you’re leaving it at. |
| Age of the house | NSW advises that buildings from before 1990 are likely to contain asbestos. |
| What’s not included | Painting, electrical work on downlights and fans, fixing the roof leak, insulation, asbestos testing and removal. |
| Prep | Who moves furniture and covers floors. |
| Price | One total including GST (the 10% goods and services tax) for a homeowner. Quotes only to a builder can show prices before GST. |
| Deposit and payment terms | Inside your state’s deposit limit, and when the balance is due. |
| Expiry date | No law sets how long a quote lasts, so set one, such as 30 days. |
Plastering quote template to copy
This layout is for a typical sagging-ceiling replacement in one room. Change the lines for a patch repair, a renovation or new plasterboard in an extension. Every amount is left blank: put in your own prices.
QUOTE [Business name] · ABN [00 000 000 000] · Licence [number, class, state] [Phone] · [Email] Quote number: Q-[number] Date: [date] Valid until: [date, e.g. 30 days from today] For: [Customer name] Job address: [Street, suburb, state, postcode] House built: about [year] Room: [lounge room], about [__] m², ceiling height [__] m THE JOB Cover floors and protect the room. Remove and dispose of the existing [__] m² ceiling and cornice. Check the ceiling framing and refix or add battens where needed. Supply and fix new [brand, type, __ mm] plasterboard and [profile, brand] cornice. Set, sand and leave ready for paint. INCLUDED • Floor and room protection • Removal and disposal of the old ceiling and cornice • Checking and refixing the ceiling framing: [details] • Plasterboard: [brand, type, thickness], about [__] m² • Cornice: [profile, brand], about [__] m • Fixing, setting and sanding ready for paint • Clean-up NOT INCLUDED • Painting • Removing and refitting downlights, fans or smoke alarms (by a licensed electrician) • Fixing the roof leak or the cause of the damage • Replacing insulation, unless listed above • Asbestos testing and removal (homes built before 1990 are likely to contain asbestos: we check before cutting or sanding) • Moving furniture, unless listed above PRICE Protection, removal and disposal: $____ Framing and battens: $____ Plasterboard and cornice supplied: $____ Labour (fix, set, sand): $____ TOTAL: $____ including GST PAYMENT Deposit: $____ to book the start date Balance: due [7 or 14] days from the invoice Bank transfer: BSB [000-000], account [00000000], reference Q-[number] BEFORE WE START Please clear the room of furniture and have the roof leak fixed before our start date. CHANGES Any change to the job, such as damaged framing found once the ceiling is down, is quoted in writing and agreed before we do it. This is a fixed-price quote. To go ahead, reply to this email or ring [phone].
Typical line items and exclusions for plastering jobs
| Line item | How to show it | Common exclusion or note |
|---|---|---|
| Protection | Floors and furniture covered | Moving furniture |
| Removal and disposal | Area of old sheets and cornice | Asbestos: testing and a licensed assessor and removalist |
| Framing and battens | Refix or add, and where | Structural repairs to the roof or frame |
| Plasterboard | m², brand, type and thickness | Wet-area or fire-rated board if it’s needed and not listed |
| Cornice | Metres and profile | Matching an old decorative cornice |
| Setting and sanding | The finish you leave it at | Painting |
| Patch repairs | Number and size of patches, room | Repainting the whole wall or ceiling |
| Skim coat or solid plaster | Area and walls | Hidden cracking behind old plaster |
| Water damage | Area replaced | Fixing the roof leak first |
| Electrical fittings | Not quoted | Downlights, fans and smoke alarms: licensed electrician |
Cover email to send with the plastering quote
Subject: Your quote for the [room] ceiling at [address] from [business name]
Hi [name], Thanks for having me out to look at the [lounge room] ceiling. Your quote to replace it is attached: a fixed price of $____ including GST, good until [date]. It covers taking the old ceiling down, new plasterboard and cornice, and leaving it set and sanded ready for paint. It doesn’t include painting, the downlights (your electrician will need to take them down and put them back) or fixing the roof leak, which needs to be done before we start. If you’d like to go ahead, reply yes and I’ll send the deposit invoice and book a start date. If anything isn’t clear, ring me on [phone]. If you’d rather we didn’t follow up, just reply “no thanks”. Thanks, [Your name] [Business name] · ABN [number] · Licence [number]
What a plastering tax invoice must show
If you’re registered for GST, the ATO says a tax invoice must show 7 things. For sales of $1,000 or more it must also show the customer’s name or ABN. When you’re subbing to a builder, put the builder’s business name and ABN on it.
| Must show | On a plastering invoice |
|---|---|
| That it’s intended to be a tax invoice | The words “Tax invoice” at the top. |
| Your business name | As on the quote. |
| Your ABN | Your Australian Business Number. |
| The date issued | The day you send it. |
| A brief description, with quantity and price | Rooms, m² of board, metres of cornice, labour. |
| The GST payable | As its own amount, or “Total price includes GST” when the GST is exactly one-eleventh of the total. |
| How much of each sale is taxable | Mark any GST-free items. |
| For $1,000 or more: the buyer’s identity or ABN | The homeowner’s name, or the builder’s business name or ABN. |
Always put your ABN on invoices to builders: a business customer may have to withhold 47% of the payment if you don’t. A PDF by email is fine, and you need to keep most business records for at least 5 years (business.gov.au).
Plastering invoice template to copy
This layout takes off the deposit and has a line for an approved variation. For a builder, bill their business and use their job or purchase order number.
TAX INVOICE [Business name] · ABN [00 000 000 000] · Licence [number] [Phone] · [Email] Invoice number: INV-[number] Date issued: [date] Due date: [date] Your quote number: Q-[number] Builder's job or purchase order number: [if subbing] Bill to: [Customer name] / [Builder business name], ABN [number] Job address: [Street, suburb, state, postcode] WORK DONE Protection, removal and disposal of old ceiling, [room] $____ Framing and battens: [details] $____ Plasterboard [brand, type, __ mm], [__] m² $____ Cornice [profile], [__] m $____ Labour: fix, set and sand, [dates] $____ Variation V-[number]: [extra battens] (approved [date]) $____ Subtotal (excluding GST): $____ GST (10%): $____ TOTAL including GST: $____ Less deposit paid: $____ BALANCE DUE: $____ HOW TO PAY Bank transfer: BSB [000-000], account [00000000], reference INV-[number] Please pay by [due date].
Deposits, progress payments and written contracts for plasterers
- On a whole-house job, set any progress payment stages in the written contract (for example after sheeting, then after setting), and invoice each stage as it’s reached. Rules differ by state, so check with your regulator.
- When you sub to a builder, your payment terms are whatever you agree with the builder. Put them on the quote.
- Damaged framing or extra rooms found once the old ceiling is down go on a written variation the customer approves before you do the work.
| State | Written contract | Maximum deposit |
|---|---|---|
| NSW | Residential building work over $5,000 including GST | 10% of the contract price, and no deposit until home building compensation cover is in place where it’s required |
| VIC | Most domestic building work over $10,000 | 10% if the contract is under $20,000; 5% if it’s $20,000 or more |
| QLD | Domestic building work over $3,300, with your licence number as on your QBCC licence | 20% for work of $3,300 or less; 10% for $3,301 to $19,999; 5% for $20,000 or more |
Let AI write it
With LeadAI, SAM writes the quote and the invoice while you talk the job through on the drive home, from the sheets and the cornice to the setting and sanding. Emily follows up the quotes you’ve sent, and Carol chases the deposit and the final payment. The scope and the price are always yours. From about $2.08 a day each on the Growth plan, plus GST.
A chat assistant like ChatGPT can also turn your measure notes into a quote draft. Leave out the customer’s phone number, and check every line before you send it.
Turn my notes below into a plastering quote for a homeowner in Australia. Use this layout: business details with licence number, quote number, valid-until date, job address, year the house was built, the room and area, the job in plain words, INCLUDED, NOT INCLUDED, PRICE, PAYMENT, BEFORE WE START, CHANGES. Rules: use only the prices I give you and write $____ where I haven't given one. Show the total including GST. List painting, downlights and other electrical work, fixing the roof leak and asbestos testing as not included. Don't add work I haven't mentioned. My notes: [e.g. lounge room ceiling sagging, about 20 m2, 2.7 m high, house built about 1975, 10 mm standard board, 90 mm cove cornice, re-batten, leave ready for paint]
Questions people ask
- Does a plastering quote need my licence number?
- Show it on every quote. In NSW, dry and wet plastering each need a contractor licence for residential work over $5,000 in labour and materials. In Queensland, a QBCC licence is needed over $3,300 and the number must be on contracts. In Victoria, plastering alone doesn’t need registration, but plastering combined with another skill does over $10,000.
- Should I include painting in a plastering quote?
- Say clearly whether it’s in or out. Most plastering quotes leave the work set and sanded ready for paint and list painting as not included, so the customer knows to book a painter.
- What do I put on the quote about asbestos?
- Note roughly when the house was built. NSW advises that buildings from before 1990 are likely to contain asbestos, so list asbestos testing and removal by a licensed assessor and removalist as not included, and check before you cut or sand.
- Should I charge a deposit for plastering?
- Many plasterers take one to book the start date. For home building work, keep inside your state’s limit: 10% in NSW; in Victoria 10% under $20,000 and 5% from $20,000; in Queensland 20% up to $3,300, 10% from $3,301 to $19,999 and 5% from $20,000.
- Do I show GST on a quote to a builder?
- Quotes only to businesses can show prices before GST, as long as that’s clear. For a homeowner, show the total including GST as one figure, at least as prominent as any breakdown.
Sources
- 1. ACCC, Component pricing
- 2. WA Consumer Protection, Estimates and quotes
- 3. ATO, Tax invoices (last updated 18 September 2026)
- 4. business.gov.au, How to invoice
- 5. ATO, Withholding if ABN not provided
- 6. NSW Government, Dry plastering work (June 2026)
- 7. NSW Government, Wet plastering work (June 2026)
- 8. NSW Government, Contracts for residential building work
- 9. NSW Government, Asbestos safety
- 10. QBCC, When you need a licence
- 11. QBCC, Plastering drywall licence
- 12. QBCC, Plastering solid licence
- 13. QBCC, Deposits and progress payments
- 14. Consumer Affairs Victoria, Becoming a registered building practitioner (July 2025)
- 15. Consumer Affairs Victoria, Deposits and payments
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Quote template for tradies: what every tradesman’s quote needs, plus a free template to download
What every quote needs, a free quote template in Word and PDF, a cover email to copy, the GST and pricing rules, and when a quote has to become a written contract.
- Invoice template for tradies: free tax invoice template (Word and PDF), plus what the ATO requires
A free tax invoice template in Word and PDF, a plain invoice for tradies not registered for GST, what the ATO requires on every tax invoice, and wording to copy.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- How to chase unpaid invoices as a tradie in Australia
Reminder timings that work, the contact rules you have to stay inside, letters of demand, Security of Payment and small claims limits by state.
- Best AI tools and apps for plasterers (2026)
How plasterers use AI and phone apps to measure rooms and ceilings, check sheet, cornice and compound quantities, show cornice styles, quote sagging and water-damaged ceilings, and write insurance reports, with prices and prompts.