The short answer
A carpentry quote should show your business name, ABN (Australian Business Number) and licence number, the customer and job address, the work with sizes, timber by species, grade and treatment, fixings and finishes, what’s not included (such as council approval, engineering, painting and making good, and hidden rot found once work starts), the total price including GST (the 10% goods and services tax), the deposit and progress payments, how variations are priced and an expiry date. In NSW, carpentry over $5,000 in labour and materials needs a contractor licence and a written contract, with the deposit capped at 10%. The invoice must say “Tax invoice” if you’re registered for GST and show your business name, ABN, the date, the work with quantity and price, and the GST; for $1,000 or more, add the customer’s name or ABN.
What a carpentry quote should include
| Item | For a carpenter, that means |
|---|---|
| Business name, ABN, contact details | So the customer knows who it’s from. Your ABN goes on the invoice too. |
| Licence number | NSW: a contractor licence for carpentry over $5,000 in labour and materials. Queensland: a QBCC (Queensland Building and Construction Commission) licence for building work over $3,300; decks and pergolas sit in the separate structural landscaping class, so check with the QBCC. Victoria: registration for domestic building work over $10,000. |
| Job address and access | Site access, where timber can be stored, and power on site. |
| The work, with sizes | Deck area and height off the ground, number of doors, linear metres of skirting or wardrobe. |
| Timber and materials | Species, grade and treatment for structure and decking, hardware and fixings by brand, and the finish. |
| Barriers and approvals | Under the National Construction Code, a deck needs a barrier at least 1 metre high where someone could fall 1 metre or more. Say who handles council approval. |
| What’s not included | Council approval and engineering, painting and making good, electrical and plumbing, and rot or damage found once work starts. |
| Price, deposit and progress payments | The total including GST, the deposit inside your state’s limit, and payments tied to stages. |
| Variations | Any change quoted in writing and signed before you do the work. |
| Expiry | A date the quote runs out, such as 30 days, so timber price changes don’t catch you out. |
Carpentry quote template to copy
Copy this into your quoting app, a Word document or an email, and change the scope, timber and amounts to suit the job. The deck is only there to show the layout. Put in your own work and your own prices.
QUOTE [Business name] · ABN [00 000 000 000] · Licence [number] [Phone] · [Email] Quote number: Q-[0000] Date: [date] Valid until: [date, e.g. 30 days] For: [Customer name] Job address: [Street, suburb, state, postcode] Access: [side access, timber storage, power on site] THE JOB Build a new [length] m x [width] m deck off the back door, [height] m off the ground, with [steps / balustrade]. 1. FOOTINGS AND SUBFLOOR Set out, [number] footings, posts, bearers and joists in [species, grade, treatment] $____ 2. DECKING [area] m² of [species / composite, board size], fixed with [fixing type, brand] $____ 3. STEPS AND BALUSTRADE [number] steps; balustrade [length] m in [material], at least 1 m high where the fall is 1 m or more $____ 4. FINISH [oil / stain, brand, coats] $____ 5. SITE Clean-up and removal of offcuts and rubbish $____ INCLUDED • All timber, fixings and hardware listed above • Labour to build and finish as described NOT INCLUDED • Council approval or engineering, if needed • Electrical work (lights, power points) and plumbing • Painting or making good to the house • Rot, termite damage or services found once work starts (quoted in writing before we go on) PRICE Labour: $____ Materials: $____ TOTAL: $____ including GST PAYMENT Deposit: $____ to book the start date Progress payment: $____ when the subfloor is complete Balance: due [7 or 14] days from the final invoice Bank transfer: BSB [000-000], account [00000000], reference Q-[0000] VARIATIONS Any change is quoted on a written variation and signed by both of us before we do the work. This is a fixed-price quote. To go ahead, sign below or reply to this email. Accepted by: ____________________ Date: __________
Typical line items and exclusions for carpentry jobs
| Line item or exclusion | Job type | What to write |
|---|---|---|
| Footings, posts, bearers, joists | Decks and pergolas | Number of footings, timber species, grade and treatment. |
| Decking boards | Decks | Area, species or composite, board size and fixings. |
| Balustrades and handrails | Decks and stairs | Length, material and height. |
| Doors | Doors | How many, the door and hardware by brand, and whether frames are replaced. |
| Rotten timber repair | Repairs | Where, what’s replaced, and that extra rot is a variation. |
| Skirting and architraves | Renovations | Linear metres, profile and timber. |
| Built-in wardrobes and shelving | Fit-outs | Linear metres, carcass and door materials, hardware. |
| Framing or fit-off for a builder | Subcontract | The stage, the plans you’re working to, and your rate or fixed price. |
| Council approval and engineering | Exclusion | Usually excluded. Say who arranges it. |
| Painting and making good | Exclusion | Excluded unless priced. Most arguments start here. |
Cover email to send with the quote
Subject: Your deck quote for [address] from [business name]
Hi [name], Thanks for having me out to measure up. Your quote for [the new deck] is attached. It lists the timber, the sizes and the finish, and it’s a fixed price of $____ including GST, good until [date]. The quote also says what’s not included, like council approval and anything we find once we start, so there are no surprises later. If you’d like to change the size, the decking or the balustrade, just reply and I’ll update it. To lock in a start date, reply yes and I’ll send the deposit details. If you’d rather we didn’t follow up, just reply “no thanks”. Thanks, [Your name] [Business name] · ABN [number] · Licence [number]
What a carpentry tax invoice must show
If you’re registered for GST, your invoice must be a tax invoice. The ATO (Australian Taxation Office) says it must show:
- That it’s intended to be a tax invoice: put “Tax invoice” at the top.
- Your business name and your ABN.
- The date it was issued.
- A brief description of the work and materials, with quantity (if it applies) and price.
- The GST payable, or “Total price includes GST” if the GST is exactly one-eleventh of the total.
- The extent to which each item is taxable.
- For sales of $1,000 or more: the customer’s name or ABN.
If a customer asks for a tax invoice, you must give one within 28 days, unless the sale is $82.50 or less including GST. If you’re not registered for GST, call it an invoice, not a tax invoice, and don’t charge GST. Worth adding: an invoice number, the job address, your quote number and your licence number.
Carpentry invoice template to copy
Use the progress claim for each stage you’ve finished, then the final invoice to add up the job, the variations and what’s been paid.
TAX INVOICE: PROGRESS CLAIM [1] of [2] [Business name] · ABN [00 000 000 000] · Licence [number] Invoice number: INV-[0000] Date issued: [date] Due date: [date] Your quote number: Q-[0000] Bill to: [Customer name], [job address] Stage completed: footings and subfloor, finished [date] This stage $____ GST (10%): $____ THIS CLAIM including GST: $____ Quote total including GST: $____ Paid to date (including deposit): $____ Remaining after this claim: $____ Bank transfer: BSB [000-000], account [00000000], reference INV-[0000]
TAX INVOICE [Business name] · ABN [00 000 000 000] · Licence [number] [Phone] · [Email] Invoice number: INV-[0000] Date issued: [date] Due date: [date] Your quote number: Q-[0000] Bill to: [Customer name], [ABN if a business] Job address: [Street, suburb, state, postcode] WORK DONE New deck as quoted, [length] m x [width] m $____ Variation V-[01]: [replace rotten joists, signed date] $____ Variation V-[02]: [extra step, signed date] $____ Subtotal (excluding GST): $____ GST (10%): $____ TOTAL including GST: $____ Less deposit paid [date]: $____ Less progress claims paid: $____ BALANCE DUE: $____ HOW TO PAY Bank transfer: BSB [000-000], account [00000000], reference INV-[0000] Please pay by [due date].
Deposits, progress payments and written contracts for carpenters
- Tie each progress payment to a stage the customer can see, such as “subfloor complete”.
- Variations go in writing and are signed by you and the customer before you do the work. In NSW, both parties sign.
- Home warranty insurance may be needed on bigger jobs. Check with your state regulator.
| State | What applies |
|---|---|
| NSW | A contractor licence for carpentry over $5,000 in labour and materials; unlicensed work can mean fines of $22,000 for an individual and $110,000 for a company. Contracts over $5,000 must be in writing, with the deposit capped at 10%. |
| QLD | A QBCC licence for building work over $3,300, and domestic building work over $3,300 needs a written, signed contract before work starts, with your licence number on it. |
| VIC | Registration for domestic building work over $10,000, and a major domestic building contract for most domestic building work over $10,000. |
Let AI write it
Talk SAM through the timber, the fixings and the hours on the drive home, and LeadAI’s SAM writes the quote and the invoice by voice. Emily follows up every quote you send, and Carol chases the deposit, the progress claims and the final invoice with the reminders you’ve approved. The scope, the price and the contract stay with you. From about $2.08 a day each on the Growth plan, plus GST.
A chat assistant like ChatGPT, Microsoft Copilot or Google Gemini can also turn your site notes into a first draft. Check every size, timber grade and price before it goes out.
You’re helping an Australian carpenter write a quote. Using my site notes below, write a quote in this order: the job, each stage as a numbered section (sizes, timber species, grade and treatment, fixings), finish, what’s included, what’s not included (council approval, engineering, painting and making good, hidden rot), price (labour, materials, total including GST), deposit and progress payments, how variations are handled, and the expiry date. Leave every price as $____ for me to fill in. Use plain Australian English. Don’t add anything I haven’t mentioned or give building rules advice; list any questions instead. My notes: [paste your notes or voice-note transcript: sizes, height off the ground, timber, access, extras]
Questions people ask
- Does a carpentry quote need my licence number?
- Where the job needs a licence, show it. In NSW, carpentry over $5,000 in labour and materials needs a contractor licence. In Queensland, building work over $3,300 needs a QBCC licence and the licence number must be on the contract. In Victoria, domestic building work over $10,000 needs registration.
- How much deposit can a carpenter take?
- It depends on your state. In NSW, the deposit is capped at 10% on contracts over $5,000. Other states set their own limits, so check your state’s building or fair trading regulator before you set it.
- Quote or estimate for carpentry?
- Say which it is. A quote is a fixed price once accepted; an estimate can change. On repairs where you can’t see the extent of the rot, quote a fixed price for what you can see and put anything more on a signed variation.
- What should a deck quote exclude?
- Usually council approval and engineering, electrical and plumbing, painting and making good to the house, and rot, termite damage or services found once work starts. Say who arranges any approval.
- Do I need a written contract for a carpentry job?
- For bigger home jobs, yes: over $5,000 in NSW, over $3,300 for domestic building work in Queensland, and most domestic building work over $10,000 in Victoria. The quote can become part of the contract. Other states have their own limits.
Sources
- 1. ATO, Tax invoices
- 2. business.gov.au, How to invoice
- 3. ACCC, Component pricing
- 4. WA Consumer Protection, Estimates and quotes
- 5. NSW Government, Carpentry work (June 2026)
- 6. NSW Government, Contracts for residential building work
- 7. QBCC, When you need a licence
- 8. QBCC, Key information for licensees and home owners
- 9. Consumer Affairs Victoria, Preparing a major domestic building contract
- 10. Consumer Affairs Victoria, Getting quotes (October 2025)
- 11. NSW Planning, Balconies, decks and patios (March 2026)
- 12. National Construction Code 2022, Housing Provisions Part 11.3, Barriers and handrails
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Quote template for tradies: what every tradesman’s quote needs, plus a free template to download
What every quote needs, a free quote template in Word and PDF, a cover email to copy, the GST and pricing rules, and when a quote has to become a written contract.
- Invoice template for tradies: free tax invoice template (Word and PDF), plus what the ATO requires
A free tax invoice template in Word and PDF, a plain invoice for tradies not registered for GST, what the ATO requires on every tax invoice, and wording to copy.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- How to chase unpaid invoices as a tradie in Australia
Reminder timings that work, the contact rules you have to stay inside, letters of demand, Security of Payment and small claims limits by state.
- Best AI tools and apps for carpenters and chippies (2026)
Which AI and design tools a chippie can use for cutting lists, deck and pergola designs, plans, quotes, variations and photo updates, what they cost and how to check the numbers.