The short answer
A cabinet maker’s quote should show your business name, ABN (Australian Business Number) and licence number where your state needs one, the customer and job address, the drawings or plan it’s based on, each room with carcass and door materials, finishes, hardware brands and the benchtop, installation, what’s not included (like plumbing, electrical, tiling, removing the old kitchen or a benchtop by others), a total that says whether GST (the 10% goods and services tax) is included, the deposit and progress payments, and an expiry date. On home jobs, a written contract is needed in NSW for work over $5,000 and in Queensland over $3,300, and deposits are capped by state. Your invoice must be a tax invoice if you’re registered for GST: the words “Tax invoice”, your business name and ABN, the date, the work or stage with its price, and the GST. For sales of $1,000 or more it must also show the customer’s name or ABN.
What a cabinet maker’s quote should include
| Item | Why it matters for cabinet making |
|---|---|
| Business name, ABN, contact details | So the customer and the builder know who it’s from. |
| Licence number | NSW: joinery, including built-in cupboards, wardrobes and entertainment units, needs a contractor licence for residential work over $5,000 in labour and materials. Queensland: the QBCC (Queensland Building and Construction Commission) cabinet making licence, needed for building work over $3,300. Victoria: registration for a domestic building contract over $10,000. |
| Quote number, date, customer and job address | Plus access, like stairs, parking and a lift. |
| Drawings | The plan or drawing number and date the quote is based on, so a later change is easy to spot. |
| Each room | Kitchen, wardrobe, vanity or laundry as its own section. |
| Materials and finishes | Carcass board and colour, door and panel material, edging, finish (like two-pack, laminate or veneer), handles or push-to-open. |
| Hardware | Hinge and drawer runner brand and type, soft close, bins, inserts and lighting. |
| Benchtop | Material, thickness and edge, or “benchtop by others”. Engineered stone benchtops can’t be made, supplied or installed anywhere in Australia since 1 July 2024. |
| What’s not included | Plumbing, electrical, tiling and splashbacks, removing and disposing of the old kitchen, making good walls and floors, appliances, painting. |
| Price | The total, and whether GST is included. For a homeowner, the total including GST must be at least as clear as any breakdown. |
| Deposit and progress payments | Each stage and its amount, inside your state’s limits. |
| Variations, quote or estimate, expiry | Changes quoted in writing first. A quote is a fixed price once accepted. Set an expiry date, as board and hardware prices move. |
Cabinet maker quote template to copy
This layout uses a typical kitchen with a built-in wardrobe. Swap in your own rooms and materials. Every amount is left blank on purpose: put in your own prices. On bigger home jobs the quote can become part of a written contract, signed before work starts.
QUOTE [Business name] · ABN [00 000 000 000] · Licence [number and state] [Phone] · [Email] Quote number: Q-[0000] Date: [date] Valid until: [date] Based on drawings: [drawing number], dated [date] For: [Customer name] Job address: [Street, suburb, state, postcode] Access: [stairs / parking / lift] 1. KITCHEN Carcasses: [board type and colour], [edging] Doors and panels: [material and finish], [colour] Handles: [brand and model / push-to-open] Hinges and drawers: [brand], soft close, [number] drawers Extras: [bin pull-out, pantry inserts, LED strip lighting] Benchtop: [material, thickness, edge] [or: by others] Supply and install, including end panels, kickboards and fillers 2. MAIN BEDROOM BUILT-IN WARDROBE Carcasses: [board type and colour] Doors: [hinged / sliding], [material and finish] Inside: [hanging rails, shelves, drawers] as per drawing Supply and install NOT INCLUDED • Plumbing and electrical connections (licensed plumber and electrician) • Tiling and splashbacks • Removing and disposing of the old kitchen [unless listed] • Making good walls, floors and ceilings, and painting • Appliances • Benchtop [if by others] PRICE 1. Kitchen, supply and install: $____ 2. Wardrobe, supply and install: $____ TOTAL: $____ including GST PAYMENT STAGES Deposit, on signing: $____ On [carcasses delivered to site]: $____ On completion of installation: $____ Each stage invoiced and due [7] days from the invoice. Bank transfer: BSB [000-000], account [00000000], reference Q-[0000] VARIATIONS Any change to the drawings, materials or hardware is quoted in writing and agreed before we make it. This is a fixed-price quote based on the drawings above. To go ahead, reply to this email or ring [phone].
Typical line items and exclusions for cabinet making jobs
| Job | Line items to list | Exclusions worth naming |
|---|---|---|
| New kitchen | Carcasses, doors and panels, handles, hinges and runners, extras, benchtop, installation | Plumbing, electrical, tiling, old kitchen removal, appliances, making good |
| Built-in or walk-in wardrobe | Carcasses, doors (hinged or sliding), inside fit-out, installation | Painting, carpet or floor repairs, removing old robes unless listed |
| Vanity or laundry cabinets | Cabinet, top or basin cut-out, hardware, installation | Plumbing, waterproofing, tiling, tapware |
| Entertainment unit or study | Joinery as drawn, hardware, cable cut-outs, installation | Electrical, data cabling, mounting the TV |
| Refacing | New doors and panels, hinges, handles, fitting | Repairs to carcasses found once the doors are off (quoted first) |
| Repairs | Parts (hinges, runners, doors), labour | Matching discontinued colours or finishes |
| Work for a builder | As per the builder’s drawings and schedule, supply and install | Site delays outside your control, other trades’ work |
Cover email to send with the quote
Subject: Your kitchen and wardrobe quote from [business name]
Hi [name], Thanks for your time at the design consult. Your quote is attached: $____ including GST for the kitchen and the main bedroom wardrobe, as per drawing [number]. It’s good until [date]. It lists the board, doors, hardware and benchtop for each room, the payment stages, and what isn’t included, like plumbing, electrical and tiling. If you’d like to change a finish or a handle, tell me and I’ll update it. When you’re ready to go ahead, reply yes and I’ll send the contract and the deposit invoice, then lock in the measure and production dates. Any questions, just reply or ring me on [phone]. If you’d rather we didn’t follow up, just reply “no thanks”. Thanks, [Your name] [Business name] · ABN [number] · Licence [number]
What a cabinet maker’s tax invoice must show
If you’re registered for GST, your invoice must be a tax invoice. The ATO lists what it must show. If you’re not registered for GST, call it an invoice, not a tax invoice, and don’t charge GST.
| Must show | On a cabinet maker’s invoice |
|---|---|
| That it’s intended to be a tax invoice | The words “Tax invoice” at the top. |
| Your business name and ABN | As on your quote. |
| The date it was issued | The day you send it. |
| A brief description with quantity and price | The stage being invoiced, and the work or rooms it covers. |
| The GST payable | As its own amount, or “Total price includes GST” when the GST is exactly one-eleventh of the total. |
| The extent each sale is taxable | Mark any GST-free items. |
| For sales of $1,000 or more: the buyer’s identity or ABN | The customer’s name, or the builder’s business name or ABN. |
Cabinet maker invoice templates to copy
Two versions: a deposit or progress invoice for each stage, and the final invoice that shows everything paid so far.
TAX INVOICE: [DEPOSIT / PROGRESS PAYMENT 2] [Business name] · ABN [00 000 000 000] · Licence [number and state] [Phone] · [Email] Invoice number: INV-[0000] Date issued: [date] Due date: [date] Contract or quote number: Q-[0000] Bill to: [Customer or builder name], ABN [if a business] Job address: [Street, suburb, state, postcode] [Deposit on signing / Stage 2: carcasses delivered to site on (date)], as per contract Q-[0000] $____ Subtotal (excluding GST): $____ GST (10%): $____ THIS INVOICE including GST: $____ Contract total including GST: $____ Paid to date: $____ Remaining after this invoice: $____ Bank transfer: BSB [000-000], account [00000000], reference INV-[0000]
TAX INVOICE: FINAL [Business name] · ABN [00 000 000 000] · Licence [number and state] Invoice number: INV-[0000] Date issued: [date] Due date: [date] Contract or quote number: Q-[0000] Bill to: [Customer or builder name], ABN [if a business] Job address: [Street, suburb, state, postcode] WORK DONE 1. Kitchen, supplied and installed as per drawing [number] $____ 2. Main bedroom wardrobe, supplied and installed $____ Variation V-[01], approved [date]: [change, e.g. extra drawer bank] $____ Subtotal (excluding GST): $____ GST (10%): $____ TOTAL including GST: $____ Less deposit paid (INV-[0000]): $____ Less progress payment paid (INV-[0000]): $____ BALANCE DUE: $____ HOW TO PAY Bank transfer: BSB [000-000], account [00000000], reference INV-[0000] Please pay by [due date].
Deposits, progress payments and written contracts for cabinet makers
On home jobs, the state rules on licences, written contracts and deposits apply to kitchens and built-in joinery. These are the rules on the cabinet makers page and in our general guides.
| State | Licence and written contract | Deposit |
|---|---|---|
| NSW | A contractor licence for residential joinery over $5,000 in labour and materials. A written contract for work over $5,000 including GST: the small works contract from $5,000 to $20,000, a full home building contract over $20,000. | Up to 10%. No deposit until home building compensation cover is in place, where it’s required. |
| QLD | The QBCC cabinet making licence for work over $3,300, and a written, dated contract signed by both sides before work starts, with your licence number on it. | Generally 20% for $3,300 or less, 10% for $3,301 to $19,999 and 5% from $20,000, but up to 20% where custom work made off site, such as kitchen cabinetry, is more than half the contract price. |
| VIC | Registration for a domestic building contract over $10,000; cabinet making isn’t on the list of exempt single trades. A major domestic building contract with a 5-day cooling-off clause. | As at July 2025: 10% under $20,000 and 5% from $20,000, with insurance in place before any deposit on work over $16,000. Victoria’s rules are being updated, so check the current ones with the Building and Plumbing Commission. |
Let AI write the quote and the invoices
With LeadAI, you talk SAM through the job on the drive back, from the carcasses and the doors to the hardware, the benchtop and the install, and SAM writes the quote, then the deposit, progress and final invoices. Emily follows up every quote you’ve sent until it’s a yes or a no, so the kitchen quote doesn’t just go quiet, and Carol sends the deposit and progress payment reminders you’ve approved. The design and the price stay with you. On the Growth plan they’re about $2.08 a day each, plus GST.
No LeadAI? A chat assistant like ChatGPT can turn your consult notes into a first draft. Check every material, hardware item and price before you send it.
You are helping an Australian cabinet maker write a quote. Turn my consult notes below into a clear quote using this layout: business details and licence, customer and job address, the drawings it’s based on, each room as its own numbered section (carcasses, doors and finish, handles, hinges and drawers, extras, benchtop, install), not included (plumbing, electrical, tiling, old kitchen removal, making good, appliances), price per room and total including GST, payment stages, variations, expiry date. Don’t make up any prices, brands or sizes: leave $____ or [__] where I haven’t given one, and list anything you’re unsure of at the end as a question for me. Plain Australian English. My notes: [paste your consult notes or voice-note transcript]
Questions people ask
- Does a cabinet maker’s quote need my licence number?
- Show it wherever your state needs a licence for the work. In NSW, residential joinery over $5,000 needs a contractor licence. In Queensland, the QBCC cabinet making licence applies to work over $3,300, and your licence number must be on the contract. In Victoria, registration is needed for a domestic building contract over $10,000.
- How much deposit can a cabinet maker take on a kitchen?
- It depends on the state and the contract price. NSW caps it at 10%. Queensland generally allows 5% on contracts of $20,000 or more, but up to 20% where custom work made off site, like kitchen cabinetry, is more than half the contract price. Victoria, as at July 2025, capped it at 10% under $20,000 and 5% from $20,000. Check the current rules with your state regulator.
- Do I need a written contract for a kitchen?
- Often, yes. Home building work needs a written contract over $5,000 including GST in NSW, over $3,300 in Queensland, and for most domestic building work over $10,000 in Victoria. The quote can become part of the contract, signed before work starts.
- What should a kitchen quote say is not included?
- Plumbing and electrical connections, tiling and splashbacks, removing the old kitchen, making good walls and floors, painting, appliances, and the benchtop if it’s by others. Most arguments on kitchen jobs start with something the customer thought was included.
- Can I still quote stone benchtops?
- Not engineered stone. Since 1 July 2024, engineered stone benchtops, panels and slabs can’t be made, supplied or installed anywhere in Australia. Name the benchtop material on the quote, or list the benchtop as by others.
Sources
- 1. ATO, Tax invoices
- 2. business.gov.au, How to invoice
- 3. ACCC, Component pricing
- 4. WA Consumer Protection, Estimates and quotes
- 5. NSW Government, Contracts for residential building work
- 6. NSW Government, Joinery work (June 2026)
- 7. NSW Government, Kitchen, bathroom and laundry renovation work (June 2026)
- 8. QBCC, Cabinet making licence
- 9. QBCC, Deposits and progress payments (June 2025)
- 10. QBCC, Key information for licensees and home owners
- 11. Consumer Affairs Victoria, Becoming a registered building practitioner (July 2025)
- 12. Consumer Affairs Victoria, Deposits and payments for domestic building (July 2025)
- 13. Consumer Affairs Victoria, Preparing a major domestic building contract
- 14. SafeWork SA, Engineered stone prohibition
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Quote template for tradies: what every tradesman’s quote needs, plus a free template to download
What every quote needs, a free quote template in Word and PDF, a cover email to copy, the GST and pricing rules, and when a quote has to become a written contract.
- Invoice template for tradies: free tax invoice template (Word and PDF), plus what the ATO requires
A free tax invoice template in Word and PDF, a plain invoice for tradies not registered for GST, what the ATO requires on every tax invoice, and wording to copy.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- How to chase unpaid invoices as a tradie in Australia
Reminder timings that work, the contact rules you have to stay inside, letters of demand, Security of Payment and small claims limits by state.
- Best AI tools and apps for cabinet makers (2026)
How kitchen, wardrobe and joinery businesses use AI and cabinet software to turn customer photos into a first quote, design and render the job, show a finish, produce cut lists, plan the install, bill progress payments and follow up quotes, with prices and prompts.