The short answer
A builder’s quote should show your business name, ABN and builder’s licence number, the client and site address, the scope stage by stage, what’s not included (such as council approvals, engineering or making good), a total price that says whether GST is included, the deposit and progress payment stages, how variations are priced and an expiry date. On most home jobs the quote isn’t enough: a written contract is needed for residential building work over $5,000 including GST in NSW, over $3,300 in Queensland and, for most work, over $10,000 in Victoria, and deposits are capped by state. Each progress invoice must be a tax invoice if you’re registered for GST, showing your business name, ABN, the date, the stage with its price, the GST and, for $1,000 or more, the client’s name or ABN.
What a builder’s quote should include
| Item | For a builder |
|---|---|
| Business name, ABN and licence number | Your builder’s licence. NSW needs a licence for work over $5,000. In Queensland a QBCC licence is needed over $3,300, and the number must appear on contracts as it is on your QBCC licence. |
| Quote number, date and expiry | No law sets how long a quote lasts. Material prices move, so set an expiry date, such as 30 days. |
| Client, site address and access | Site access, parking, skip bin position, working hours, and whether the home will be lived in during the job. |
| Scope, stage by stage | Demolition, framing, waterproofing, linings, fit-off, with the brand and model of anything you supply. Name the plans or drawings the price is based on. |
| Prime cost and provisional sums | Allowances for items not yet chosen (tapware, tiles) or work you can’t price yet, clearly marked so the client knows they can change. |
| What’s not included | Council approvals or permits, engineering, asbestos testing and removal, making good outside the work area, and anything found behind walls. |
| Price and GST | The total including GST, shown at least as clearly as any breakdown for a homeowner. |
| Deposit and progress payments | The deposit (within your state’s cap) and each stage payment, tied to a stage of work being done. |
| Variations and expiry | Every change in writing, agreed before the work. Say it’s a quote (fixed) or an estimate. |
Builder quote template to copy
Copy this into your quoting software or an email and change it to suit the job. The bathroom renovation is only there to show the layout: put in your own scope and prices. On jobs above your state’s contract limit, this quote becomes part of the written contract, not a replacement for it.
QUOTE [Business name] · ABN [00 000 000 000] · Builder's licence [number] [Phone] · [Email] Quote number: Q-[number] Date: [date] Valid until: [date, e.g. 30 days] For: [Client name] Site address: [Street, suburb, state, postcode] Based on: [plans, drawings or site visit on (date)] Site access: [parking, skip bin position, working hours, home occupied or not] THE SCOPE 1. Demolition and removal of the existing bathroom $____ 2. Framing and wall repairs $____ 3. Plumbing rough-in and fit-off (licensed plumber) $____ 4. Electrical rough-in and fit-off (licensed electrician) $____ 5. Waterproofing and certificate $____ 6. Wall and floor linings $____ 7. Tiling: [area in m2] $____ 8. Fixtures fitted: [vanity, toilet, shower screen by brand, model] $____ 9. Clean-up and rubbish removal $____ ALLOWANCES (can change once chosen) Prime cost: tapware allowance $____ Prime cost: tile allowance per m2 $____ Provisional sum: [work that can't be priced yet] $____ NOT INCLUDED • Council approvals or permits, unless listed above • Engineering or structural changes • Asbestos testing and removal • Painting or making good outside the bathroom • Rot, termite damage or faults found behind walls (quoted in writing as a variation) PRICE TOTAL: $____ including GST PAYMENT Deposit: $____ ([%] of the contract price, within the state limit) Progress payments: • Demolition and framing complete: $____ • Waterproofing complete: $____ • Tiling complete: $____ • Practical completion: $____ Bank transfer: BSB [000-000], account [00000000], reference Q-[number] VARIATIONS Any change is put in writing, priced and signed before we do the work. This is a fixed-price quote, except the allowances listed. To go ahead, reply to this email or ring [phone] and we'll send the contract.
Typical line items and exclusions for building jobs
| Job | Line items to list | Exclusions to spell out |
|---|---|---|
| Bathroom renovation | Demolition, framing, plumbing and electrical by licensed trades, waterproofing, linings, tiling, fixtures, clean-up | Permits, asbestos, making good outside the room, what’s found behind walls |
| Kitchen renovation | Demolition, cabinetry by supplier and model, benchtops, splashback, plumbing and electrical fit-off, appliances fitted | Appliances supplied by the client, flooring outside the kitchen, gas changes unless listed |
| Ground-floor extension | Site set-out, slab or footings, frame, roof, lock-up, fixing, linings, by stage | Council and engineering fees, soil testing, landscaping, services relocation |
| Storm damage repair | Make-safe, inspection, repairs by area, insurance report if asked | Contents damage, the insurance excess (the client pays it), upgrades beyond like-for-like |
| Deck or pergola | Footings, frame, decking or roofing by material and size, stairs, balustrade | Council approval, removing the old structure unless listed, staining or painting |
In plain terms: anything you can’t price yet becomes a clearly marked allowance, not a guess hidden in the total.
Cover email to send with the quote
Subject: Your quote for the [bathroom renovation] at [address]
Hi [name], Thanks for showing me through on [day]. Your quote for the [bathroom renovation] is attached: a fixed price of $____ including GST, plus the allowances listed for [tapware and tiles], good until [date]. It's broken into stages, so you can see what each payment covers. Anything we find behind the walls once demolition starts, we'll put in writing and price before doing it. If you'd like to go ahead, reply yes and I'll send the contract to sign. Happy to walk through it on the phone too: [phone]. If you'd rather we didn't follow up, just reply "no thanks". Thanks, [Your name] [Business name] · ABN [number] · Licence [number]
What a builder’s tax invoice must show
If you’re registered for GST, the ATO says a tax invoice must show 7 things: that it’s a tax invoice, your business name, your ABN, the date it was issued, a brief description of the work with quantity and price, the GST payable (or the words “Total price includes GST” when the GST is exactly one-eleventh of the total), and which items are taxable.
Almost every building invoice is $1,000 or more, so it must also show the client’s name or ABN. If a client asks for a tax invoice, you must give one within 28 days. A PDF by email is fine.
If you’re not registered for GST, call it an invoice, not a tax invoice, and don’t charge GST. Always quote your ABN: a business client may have to withhold 47% of the payment if you don’t.
Each progress invoice should name the stage it’s for, the contract price, what’s been paid so far and what’s left, so the client can check it against the contract in a minute.
Progress payment invoice template to copy
TAX INVOICE: PROGRESS PAYMENT [number] [Business name] · ABN [00 000 000 000] · Builder's licence [number] [Phone] · [Email] Invoice number: INV-[number] Date issued: [date] Due date: [date, as set in the contract] Contract / quote number: [number] Bill to: [Client name], ABN [if a business] Site address: [Street, suburb, state, postcode] THIS STAGE Stage [number]: [e.g. waterproofing complete], completed [date] $____ Variation [number]: [description, signed (date)] $____ Prime cost adjustment: [item, allowance vs actual] $____ Subtotal (excluding GST): $____ GST (10%): $____ THIS INVOICE including GST: $____ CONTRACT SUMMARY Contract price including GST: $____ Approved variations to date: $____ Paid to date (including deposit): $____ This invoice: $____ Remaining after this invoice: $____ HOW TO PAY Bank transfer: BSB [000-000], account [00000000], reference INV-[number] Please pay by [due date].
Deposits, progress payments and written contracts for builders
- Tie each progress payment to a stage of work being finished, and set the stages in the contract.
- Variations: in NSW they must be in writing, attached to the contract and signed by both parties. In Queensland you can’t require payment for a variation before the variation work starts.
- Formal payment claims under Security of Payment laws have strict deadlines and content rules. They’re a different document from a normal progress invoice: check your state’s rules before you rely on one.
| State | Written contract | Maximum deposit | Also applies |
|---|---|---|---|
| NSW | Residential building work over $5,000 including GST. $5,000 to $20,000 can use the small works contract; over $20,000 needs a full home building contract. | 10% of the contract price | Home Building Compensation cover must be in place before any payment on work over $20,000. Give the owner a signed contract copy within 5 business days. |
| VIC | Most domestic building work over $10,000: a major domestic building contract with a 5-day cooling-off clause, and the Domestic Building Consumer Guide given before signing | 10% under $20,000; 5% at $20,000 or more | Splitting a job into smaller contracts doesn’t get around the rules. Victoria’s building rules are being reformed, so check current figures with Consumer Affairs Victoria. |
| QLD | Domestic building work over $3,300: written, dated and signed by both sides before work starts, with your licence number | 20% for $3,300 or less; 10% for $3,301 to $19,999; 5% for $20,000 or more | Home warranty premium for work over $3,300, paid by the earlier of work starting or 10 business days after signing. |
Let AI write it
If you’d rather talk than type the quote on Sunday night, LeadAI’s SAM writes quotes and invoices by voice while you walk through the job after the site visit. Emily follows up the quotes you’ve sent, and Carol reminds clients when a progress payment is due and chases it if it’s late. The price, the contract and any variation stay with you. From about $2.08 a day each on the Growth plan, plus GST.
A chat assistant such as ChatGPT, Microsoft Copilot or Google Gemini can also turn your site notes into a first-draft scope. Check every line and price before it goes out, and keep clients’ details out of free public tools.
You're helping an Australian builder write a renovation quote. Use this layout: business details with licence number, quote number, expiry date, client and site address, the scope as numbered stages with a blank $____ for each, prime cost and provisional sum allowances, a NOT INCLUDED list, total including GST, deposit, progress payment stages and a variations line. Don't add any prices or make up any rules. My site notes: [paste your notes, e.g. "main bathroom 2.4 x 3m, strip to frame, new shower no hob, wall-hung vanity, client picking tiles, possible rot under old shower base"]
Questions people ask
- Does a builder’s quote need my licence number?
- Yes, put it on every quote. In Queensland the licence number must be on contracts as it appears on your QBCC licence, and on ads for work over $3,300. In NSW a licence is needed for residential building work over $5,000.
- How much deposit can a builder take?
- For home building work: 10% in NSW; in Victoria 10% under $20,000 and 5% at $20,000 or more; in Queensland 20%, 10% or 5% depending on the contract value. In NSW, no payment on work over $20,000 until Home Building Compensation cover is in place.
- Is a quote enough, or do I need a contract?
- Over $5,000 including GST in NSW, over $3,300 in Queensland and, for most work, over $10,000 in Victoria, you need a written contract signed before work starts. The quote can become part of it.
- Quote or estimate for a renovation?
- A quote is fixed once accepted; an estimate can change. Most builders give a fixed quote with clearly marked prime cost and provisional sum allowances for the parts that can’t be priced yet, so the client knows exactly what can move.
- What goes on a progress payment invoice?
- Everything a tax invoice needs (it’s a tax invoice, your business name and ABN, the date, the work and price, the GST and the client’s name), plus the stage it’s for, approved variations, what’s been paid and what’s left on the contract.
Sources
- 1. ATO, Tax invoices
- 2. ACCC, Component pricing
- 3. WA Consumer Protection, Estimates and quotes
- 4. NSW Government, Contracts for building or renovating a home
- 5. NSW Government, Guide to providing home building contracts
- 6. NSW Government, Security of payment frequently asked questions
- 7. Consumer Affairs Victoria, Preparing a major domestic building contract
- 8. Consumer Affairs Victoria, Deposits and payments
- 9. Consumer Affairs Victoria, Getting quotes
- 10. QBCC, Key information for licensees and home owners
- 11. QBCC, When you need a licence
- 12. QBCC, Who pays home warranty and when
- 13. QBCC, Understanding deposits and progress payments
- 14. QBCC, Contract changes and variations
Pick your trade
What AI staff do in your trade: the calls they take, typical job prices and the paperwork.
- Plumbers
- Electricians
- Builders and renovators
- Air conditioning techs
- Roofers
- Painters
- Landscapers and gardeners
- Cleaning businesses
- Pest controllers
- Locksmiths
- Concreters
- Solar installers
- Tilers and flooring installers
- Carpenters
- Fencing contractors
- Handymen
- Plasterers
- Bricklayers
- Glaziers
- Pool services
- Mechanics
- Appliance repairs
- Arborists
- Cabinet makers
More guides
- Quote template for tradies: what every tradesman’s quote needs, plus a free template to download
What every quote needs, a free quote template in Word and PDF, a cover email to copy, the GST and pricing rules, and when a quote has to become a written contract.
- Invoice template for tradies: free tax invoice template (Word and PDF), plus what the ATO requires
A free tax invoice template in Word and PDF, a plain invoice for tradies not registered for GST, what the ATO requires on every tax invoice, and wording to copy.
- How to follow up a quote without being pushy
When to follow up, what to say word for word, and the Spam Act and calling rules every follow-up text, email and call has to meet.
- How to price jobs as a tradie: hourly vs fixed price, markup vs margin (Australia)
Pick the right pricing model, get markup and margin straight, price materials, call-outs, variations and after-hours work, and put your prices up without losing customers.
- How to chase unpaid invoices as a tradie in Australia
Reminder timings that work, the contact rules you have to stay inside, letters of demand, Security of Payment and small claims limits by state.
- Best AI tools and apps for builders and renovators in Australia (2026)
The AI a builder or renovator can use on the next job: estimates from plans, spec summaries, variation wording, weekly client updates, subbie schedules and concept renders, with prices and a kit for a solo renovator or a crew of 5.